


| The Easiest to Install | |
| As this series of illustrations show, installation clearly is a snap! Each piece with it's proprietary nesting feature can be positioned only one way. | |
| Step 1 | Build a sound, noncombustible foundation. |
| Step 2 | Set the base plate square and level, along with the first firebox side. |
| Step 3 | Set back right corner and place center backs along rear base plate. |
| Step 4 | Set the back left corner. |
| Step 5 | Set the remaining firebox sides. |
| Step 6 | Line the firebox with firebrick. |
| Step 7 | Place FIRE ROCK high draft throat across top of firebox sides. |
| Step 8 | Set smoke chamber components. |
| Step 9 | Set top plate to finish off firebox and smoke chamber. |
| Build chimney as plans call for, either with metal flue or FIRE ROCK solid block chimney. | |
Fire Rock | Conventional Fireplaces | Vent Free Fireplaces | Installation | Interrior Patterns
Fire Rock Brochure | Printable Installation Manual | Fire Rock Project Photos
Home | Company | Products | Restorations | Links | Locations | Contact
Us
©1990
- 2004 Metro Brick & Stone Co. All Rights Reserved. info@metrobrick.com
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |

VENT-FREE / GAS FIREPLACES














